OEE Calculator for Oil, Gas and Refining

For crude units, cracking units and gas plants, in throughput and on-spec product.

This calculator needs JavaScript. You can still read how the numbers are worked out below, including a worked example.

Your numbers

Updates as you type

Time

All calendar hours in the period: 24 for a day, 720 for a 30-day month

Turnaround and planned shutdown hours in the period (zero in a month with no turnaround), left out of OEE

Unit trips, compressor and furnace failures, utility and feed interruptions outside the plan

Output

Rated unit throughput: tonnes of feed per hour at design (a 10 million tonne-per-year crude unit is about 1,250 per hour)

Everything produced in the period, on-spec or not, in tonnes of crude

Feed processed into product that met specification first time, with no reprocessing or downgrade

Your result

Free, no sign-up

Check the highlighted fields to see your result.

Get your full OEE loss report

Your results as a PDF, with the on-stream factor and TEEP, plus our free OEE Loss Tracker (Excel) to log every period and line.

  • Your result above stays free. You never need to sign up to calculate.

By submitting, you agree to be contacted about PlantOps360. See our Privacy Policy.

How this OEE calculator works for Oil and Gas

OEE (overall equipment effectiveness) is the share of what a process unit could have made at its rated rate, in the time it was planned to run, that came out right first time. It multiplies availability (run time ÷ planned production time), performance (actual rate while running ÷ rated rate) and quality (on-spec output ÷ total output). Planned shutdowns are left out of planned production time. The full method, including how to choose the rated rate and how batch plants are handled, is on the OEE calculator for process industries page.

OEE = Availability × Performance × Quality

Worked example

A crude distillation unit has a rated throughput of 1,250 tonnes an hour and runs through a 30-day month with no turnaround. In the calculator above this is the starting example: a period of 720 hours with 0 hours of planned shutdown, so planned production time is 720 hours. Unplanned stops take 60 hours, so the plant runs for 660 hours. It makes 690000 tonnes of crude, of which 672000 tonnes of crude are on-spec, against a rated rate of 1250 tonnes of crude an hour.

FactorCalculationResult
Availability660 ÷ 72091.7%
Performance(690000 ÷ 660) ÷ 125083.6%
Quality672000 ÷ 69000097.4%
OEE91.7% × 83.6% × 97.4%74.7%

Against the whole 720 hours the plant ran 91.7% of the time (the on-stream factor) and TEEP is 74.7%. The planned shutdown is not an OEE loss, but it shows in these calendar-time figures.

The losses that matter in Oil and Gas

Refineries and gas plants run for years between turnarounds, so availability is high when things go well. The losses that remain are trips, throughput constraints and off-spec product.

Loss in Oil and GasCounted inWhat it looks like
Unit trips and emergency shutdownsAvailabilityA trip from a compressor, furnace or utility failure and the time to restart safely
Forced repairs outside the turnaroundAvailabilityA leak or equipment failure that cannot wait
Throughput constraintsPerformanceFeed rate held below design by a fouled exchanger, a furnace or a column limit
Feed and utility limitsPerformanceCrude availability, steam or power limiting the unit
Off-spec product and slopsQualityProduct that misses specification and has to be reprocessed or downgraded
Transition between feedsQualityProduct made while the unit adjusts to a new crude or operating mode

Measuring OEE properly in Oil and Gas

Keep turnarounds and planned shutdowns out of planned production time; they are visible in the on-stream factor and TEEP. For the rated rate, use the design throughput of the unit, or its demonstrated best, and say which. Refiners usually track mechanical and operational availability per unit; OEE adds the rate and the product quality to that. Calculate per unit (crude, vacuum, cracker), not for the whole refinery, because each unit has its own rate and constraints.

What do published figures say about OEE in Oil and Gas?

Refinery benchmarking is mainly proprietary and paid, so no numeric OEE benchmark could be verified and none is quoted. What is public:

  • Solomon Associates describes mechanical availability and operational availability as its primary availability metrics for refineries, weighted by unit capacity; the percentage benchmarks are in its subscription studies. Solomon Associates
  • oee.com notes that the 85% reference applies to discrete manufacturing, not process industries. oee.com

For reference, the widely quoted 85% comes from Seiichi Nakajima's 1984 book on total productive maintenance as a minimum to strive for (90% availability, 95% performance, 99% quality), and oee.com notes it was set for discrete manufacturing. Across industries, Evocon's data from more than 3,500 machines puts the typical plant nearer 55–60%. There is no audited benchmark for any single industry, so judge your line against its own trend and keep the definitions the same each time.

How maintenance software helps

  • Hold inspection, calibration and preventive maintenance of rotating equipment, relief devices and instruments on one schedule, with history ready for audit.
  • Plan turnaround work packages and spares ahead in the system, so a turnaround finishes on time.
  • Record every trip and forced stop with a cause code, so repeat causes are found and removed.

More for Oil and Gas

OEE calculators for other industries

Not your industry? Pick another one below, or search at the top of the page.

Process plants: continuous and batch How it is calculated

Production lines: parts, packs and units How it is calculated

Is your industry or kind of plant missing? Tell us what to add and we will look at building a calculator for it.

Frequently asked questions

How is OEE different from mechanical availability?
Mechanical availability is the share of time a unit is free of mechanical outages. OEE also looks at the rate the unit ran at and how much product met specification, measured against planned production time.
Do turnarounds count against OEE?
No. They are planned and left out of planned production time. They appear in the on-stream factor and TEEP.
Should I calculate OEE for the whole refinery?
No. Do it per unit, because each unit has its own rated rate, constraints and product quality.
What is a good OEE for Oil and Gas?
There is no audited benchmark for this industry. The 85% figure was set for discrete manufacturing, and across industries the typical plant is nearer 55–60%. Compare your line with its own trend, using the same definitions each time.
How do you calculate OEE for Oil and Gas?
Multiply availability (run time divided by planned production time), performance (actual rate while running divided by the rated rate) and quality (on-spec output divided by total output). Planned shutdowns are left out of planned production time.

Want help reading your OEE results?

Book a 30-minute OEE review with our team
PlantOps360

See PlantOps360 on your plant data

Book a 30-minute guided walkthrough tailored to your maintenance operations.

Personalized to your assets & workflows
See AI work orders & BI live
No commitment — bring your questions
Your details stay private. No spam, ever.