OEE Calculator for Oil, Gas and Refining
For crude units, cracking units and gas plants, in throughput and on-spec product.
This calculator needs JavaScript. You can still read how the numbers are worked out below, including a worked example.
Your numbers
Updates as you typeYour result
Free, no sign-upGet your full OEE loss report
Your results as a PDF, with the on-stream factor and TEEP, plus our free OEE Loss Tracker (Excel) to log every period and line.
- Your result above stays free. You never need to sign up to calculate.
Your report is on its way.
Want help reading it?
Book a 30-minute OEE review with our teamWe've also emailed you the links.
How this OEE calculator works for Oil and Gas
OEE (overall equipment effectiveness) is the share of what a process unit could have made at its rated rate, in the time it was planned to run, that came out right first time. It multiplies availability (run time ÷ planned production time), performance (actual rate while running ÷ rated rate) and quality (on-spec output ÷ total output). Planned shutdowns are left out of planned production time. The full method, including how to choose the rated rate and how batch plants are handled, is on the OEE calculator for process industries page.
OEE = Availability × Performance × Quality
Worked example
A crude distillation unit has a rated throughput of 1,250 tonnes an hour and runs through a 30-day month with no turnaround. In the calculator above this is the starting example: a period of 720 hours with 0 hours of planned shutdown, so planned production time is 720 hours. Unplanned stops take 60 hours, so the plant runs for 660 hours. It makes 690000 tonnes of crude, of which 672000 tonnes of crude are on-spec, against a rated rate of 1250 tonnes of crude an hour.
| Factor | Calculation | Result |
|---|---|---|
| Availability | 660 ÷ 720 | 91.7% |
| Performance | (690000 ÷ 660) ÷ 1250 | 83.6% |
| Quality | 672000 ÷ 690000 | 97.4% |
| OEE | 91.7% × 83.6% × 97.4% | 74.7% |
Against the whole 720 hours the plant ran 91.7% of the time (the on-stream factor) and TEEP is 74.7%. The planned shutdown is not an OEE loss, but it shows in these calendar-time figures.
The losses that matter in Oil and Gas
Refineries and gas plants run for years between turnarounds, so availability is high when things go well. The losses that remain are trips, throughput constraints and off-spec product.
| Loss in Oil and Gas | Counted in | What it looks like |
|---|---|---|
| Unit trips and emergency shutdowns | Availability | A trip from a compressor, furnace or utility failure and the time to restart safely |
| Forced repairs outside the turnaround | Availability | A leak or equipment failure that cannot wait |
| Throughput constraints | Performance | Feed rate held below design by a fouled exchanger, a furnace or a column limit |
| Feed and utility limits | Performance | Crude availability, steam or power limiting the unit |
| Off-spec product and slops | Quality | Product that misses specification and has to be reprocessed or downgraded |
| Transition between feeds | Quality | Product made while the unit adjusts to a new crude or operating mode |
Measuring OEE properly in Oil and Gas
Keep turnarounds and planned shutdowns out of planned production time; they are visible in the on-stream factor and TEEP. For the rated rate, use the design throughput of the unit, or its demonstrated best, and say which. Refiners usually track mechanical and operational availability per unit; OEE adds the rate and the product quality to that. Calculate per unit (crude, vacuum, cracker), not for the whole refinery, because each unit has its own rate and constraints.
What do published figures say about OEE in Oil and Gas?
Refinery benchmarking is mainly proprietary and paid, so no numeric OEE benchmark could be verified and none is quoted. What is public:
- Solomon Associates describes mechanical availability and operational availability as its primary availability metrics for refineries, weighted by unit capacity; the percentage benchmarks are in its subscription studies. Solomon Associates
- oee.com notes that the 85% reference applies to discrete manufacturing, not process industries. oee.com
For reference, the widely quoted 85% comes from Seiichi Nakajima's 1984 book on total productive maintenance as a minimum to strive for (90% availability, 95% performance, 99% quality), and oee.com notes it was set for discrete manufacturing. Across industries, Evocon's data from more than 3,500 machines puts the typical plant nearer 55–60%. There is no audited benchmark for any single industry, so judge your line against its own trend and keep the definitions the same each time.
How maintenance software helps
- Hold inspection, calibration and preventive maintenance of rotating equipment, relief devices and instruments on one schedule, with history ready for audit.
- Plan turnaround work packages and spares ahead in the system, so a turnaround finishes on time.
- Record every trip and forced stop with a cause code, so repeat causes are found and removed.
More for Oil and Gas
- Maintenance software for Oil and Gas
- Preventive maintenance schedule for Oil, gas & refining
- OEE software
- Downtime cost calculator
- MTTR and MTBF calculator
- OEE calculator for process industries
OEE calculators for other industries
Not your industry? Pick another one below, or search at the top of the page.
Process plants: continuous and batch How it is calculated
- CementCement, glass, ceramics & building materials
- Steel and MetalsSteel, foundry, forging & metals
- MiningMining & mineral processing
- Chemicals and FertilisersChemicals, fertilisers & petrochemicals
- Paper and PulpPaper, pulp & board
- Sugar and DistilleriesAgro, grain, edible oil & sugar
- DairyFood, dairy & beverage processing
- Food ProcessingFood, dairy & beverage processing
- API and Bulk DrugsAPI & bulk drugs
- TextileTextile & garments
Production lines: parts, packs and units How it is calculated
- Auto ComponentsAutomotive & auto components
- ElectronicsElectronics & electrical manufacturing
- FMCGFMCG & consumer goods
- PackagingPackaging, paper & printing
- PlasticsPlastics, rubber & polymers
- Tyre and RubberTyre & rubber
- PharmaceuticalPharmaceutical & biotech
Is your industry or kind of plant missing? Tell us what to add and we will look at building a calculator for it.