OEE Calculator for FMCG
For high-speed filling, wrapping and cartoning lines with frequent SKU changeovers.
This calculator needs JavaScript. You can still read how the numbers are worked out below, including a worked example.
Your numbers
Updates as you typeYour result
Free, no sign-upGet your full OEE loss report
Your results as a PDF, the six big losses broken down, plus our free OEE Loss Tracker (Excel) to log every shift and machine.
- Your result above stays free. You never need to sign up to calculate.
Your report is on its way.
Want help reading it?
Book a 30-minute OEE review with our teamWe've also emailed you the links.
How this OEE calculator works for FMCG
OEE (overall equipment effectiveness) is the share of planned production time that produced good packs at full speed. It multiplies availability (run time ÷ planned production time), performance (ideal cycle time × total count ÷ run time) and quality (good count ÷ total count). Planned production time is the shift length minus planned stops. The general explanation is on the OEE calculator page.
OEE = Availability × Performance × Quality
Worked example
A personal-care plant runs a sachet filling and cartoning line on an 8-hour shift. In the calculator above this is the starting example: a shift of 480 minutes with 45 minutes of planned stops, so planned production time is 435 minutes. Downtime takes 70 minutes, so run time is 365 minutes. The ideal cycle time is 1.5 seconds (0.03 minutes) per pack. The line makes 11900 packs, of which 11600 are good.
| Factor | Calculation | Result |
|---|---|---|
| Availability | 365 ÷ 435 | 83.9% |
| Performance | (0.03 min × 11900) ÷ 365 | 81.5% |
| Quality | 11600 ÷ 11900 | 97.5% |
| OEE | 83.9% × 81.5% × 97.5% | 66.7% |
The losses that matter in FMCG
FMCG lines run fast and change SKU often. Many stops last seconds, and a line can lose more to those than to any one breakdown.
| Loss in FMCG | Counted in | What it looks like |
|---|---|---|
| SKU and pack-size changeover | Availability | Cleaning, format parts and trial packs between one product and the next |
| Film, carton and label supply stops | Availability | Line waiting for packing material or a reel change |
| Jams at the wrapper, cartoner or conveyor | Performance | Short stops cleared by an operator, many times a shift |
| Running below rated speed | Performance | Line slowed to avoid jams or to match a weaker downstream machine |
| Checkweigher and seal rejects | Quality | Packs removed because of weight, seal, print or coding faults |
| Start-up waste | Quality | Product and material wasted until the line is stable after a stop |
Measuring OEE properly in FMCG
Use the rated speed of the line (often set by the slowest machine) as the ideal rate, converted to seconds per pack. On a fast line a stop of ten seconds is easy to miss by hand, so a manual log understates downtime and overstates OEE; this is a well-known effect across industries. oee.com also notes that a multi-product line tends to lose far more availability to changeovers than a single-product line, so compare lines that run a similar product mix.
What do published figures say about OEE in FMCG?
No verifiable source publishes an OEE figure for FMCG alone, so none is quoted here. What is well documented is how measurement changes the number:
- Evocon removed every reading above 100% from its dataset of 3,500+ machines because they signal a wrong calculation, and warns that understated ideal cycle times inflate OEE. Evocon
- oee.com notes that multi-product lines are likely to lose far more availability to changeovers. oee.com
For reference, the widely quoted 85% comes from Seiichi Nakajima's 1984 book on total productive maintenance as a minimum to strive for (90% availability, 95% performance, 99% quality), and oee.com notes it was set for discrete manufacturing. Across industries, Evocon's data from more than 3,500 machines puts the typical plant nearer 55–60%. There is no audited benchmark for any single industry, so judge your line against its own trend and keep the definitions the same each time.
How maintenance software helps
- Record every stop on the line with a cause code, so changeovers, material waits and jams are separated and ranked.
- Schedule preventive maintenance on fillers, sealers and wrappers by hours run, so wear parts are replaced in a planned stop.
- Track spare parts for the fast-wearing items (knives, belts, sensors), so a small stop does not become a long one.
More for FMCG
- Maintenance software for FMCG
- Preventive maintenance schedule for FMCG & consumer goods
- OEE software
- Downtime cost calculator
- MTTR and MTBF calculator
- OEE calculator
OEE calculators for other industries
Not your industry? Pick another one below, or search at the top of the page.
Process plants: continuous and batch How it is calculated
- CementCement, glass, ceramics & building materials
- Steel and MetalsSteel, foundry, forging & metals
- MiningMining & mineral processing
- Oil and GasOil, gas & refining
- Chemicals and FertilisersChemicals, fertilisers & petrochemicals
- Paper and PulpPaper, pulp & board
- Sugar and DistilleriesAgro, grain, edible oil & sugar
- DairyFood, dairy & beverage processing
- Food ProcessingFood, dairy & beverage processing
- API and Bulk DrugsAPI & bulk drugs
- TextileTextile & garments
Production lines: parts, packs and units How it is calculated
- Auto ComponentsAutomotive & auto components
- ElectronicsElectronics & electrical manufacturing
- PackagingPackaging, paper & printing
- PlasticsPlastics, rubber & polymers
- Tyre and RubberTyre & rubber
- PharmaceuticalPharmaceutical & biotech
Is your industry or kind of plant missing? Tell us what to add and we will look at building a calculator for it.