OEE Calculator for Packaging
For converting, printing, carton and flexible-pack lines with frequent job changes.
This calculator needs JavaScript. You can still read how the numbers are worked out below, including a worked example.
Your numbers
Updates as you typeYour result
Free, no sign-upGet your full OEE loss report
Your results as a PDF, the six big losses broken down, plus our free OEE Loss Tracker (Excel) to log every shift and machine.
- Your result above stays free. You never need to sign up to calculate.
Your report is on its way.
Want help reading it?
Book a 30-minute OEE review with our teamWe've also emailed you the links.
How this OEE calculator works for Packaging
OEE (overall equipment effectiveness) is the share of planned production time that produced good cartons at full speed. It multiplies availability (run time ÷ planned production time), performance (ideal cycle time × total count ÷ run time) and quality (good count ÷ total count). Planned production time is the shift length minus planned stops. The general explanation is on the OEE calculator page.
OEE = Availability × Performance × Quality
Worked example
A converter runs a folding-carton printing and die-cutting line on an 8-hour shift. In the calculator above this is the starting example: a shift of 480 minutes with 30 minutes of planned stops, so planned production time is 450 minutes. Downtime takes 80 minutes, so run time is 370 minutes. The ideal cycle time is 2 seconds (0.03 minutes) per carton. The line makes 8900 cartons, of which 8640 are good.
| Factor | Calculation | Result |
|---|---|---|
| Availability | 370 ÷ 450 | 82.2% |
| Performance | (0.03 min × 8900) ÷ 370 | 80.2% |
| Quality | 8640 ÷ 8900 | 97.1% |
| OEE | 82.2% × 80.2% × 97.1% | 64.0% |
The losses that matter in Packaging
Packaging converters sell short runs, so the time between jobs is usually the largest loss, followed by waste at the start of each run.
| Loss in Packaging | Counted in | What it looks like |
|---|---|---|
| Job changeover and plate or die change | Availability | Washing up, plate or die change and colour matching between orders |
| Reel and material changes | Availability | Stops to splice a new reel or load board, ink or adhesive |
| Web breaks and jams | Performance | Short stops from breaks, misfeeds and clearing the die-cutter |
| Running below rated speed | Performance | Press slowed to hold register, drying or print quality |
| Make-ready waste | Quality | Sheets or metres printed while colour and register are set up |
| Rejects in inspection | Quality | Cartons removed for print, cut or glue defects |
Measuring OEE properly in Packaging
Decide up front whether make-ready (the waste while a job is set up) counts as a quality loss, and apply the rule the same way every time; counting it shows the true cost of short runs. Use the press’s rated speed for the ideal rate, and count only saleable output as good. In paper and board mills the efficiency of a paper machine is measured differently (see the process calculator), because output is measured in tonnes of reel, not parts.
What do published figures say about OEE in Packaging?
Published figures for packaging come from a vendor that groups it with plastics:
- TeepTrak reports 50–65% as typical for plastics and packaging in India, with 75% or more as world class. TeepTrak India benchmark
- TeepTrak does not disclose its sample size, data source or calculation method.
For reference, the widely quoted 85% comes from Seiichi Nakajima's 1984 book on total productive maintenance as a minimum to strive for (90% availability, 95% performance, 99% quality), and oee.com notes it was set for discrete manufacturing. Across industries, Evocon's data from more than 3,500 machines puts the typical plant nearer 55–60%. There is no audited benchmark for any single industry, so judge your line against its own trend and keep the definitions the same each time.
How maintenance software helps
- Log every stop with a cause code, so changeover, reel change and web break are counted separately.
- Plan preventive maintenance on dryers, rollers, dies and drives by hours run, during job-change windows.
- Track spare parts and calibration for registration and colour-control systems, which drive both speed and waste.
More for Packaging
- Maintenance software for Packaging
- Preventive maintenance schedule for Packaging, paper & printing
- OEE software
- Downtime cost calculator
- MTTR and MTBF calculator
- OEE calculator
OEE calculators for other industries
Not your industry? Pick another one below, or search at the top of the page.
Process plants: continuous and batch How it is calculated
- CementCement, glass, ceramics & building materials
- Steel and MetalsSteel, foundry, forging & metals
- MiningMining & mineral processing
- Oil and GasOil, gas & refining
- Chemicals and FertilisersChemicals, fertilisers & petrochemicals
- Paper and PulpPaper, pulp & board
- Sugar and DistilleriesAgro, grain, edible oil & sugar
- DairyFood, dairy & beverage processing
- Food ProcessingFood, dairy & beverage processing
- API and Bulk DrugsAPI & bulk drugs
- TextileTextile & garments
Production lines: parts, packs and units How it is calculated
- Auto ComponentsAutomotive & auto components
- ElectronicsElectronics & electrical manufacturing
- FMCGFMCG & consumer goods
- PlasticsPlastics, rubber & polymers
- Tyre and RubberTyre & rubber
- PharmaceuticalPharmaceutical & biotech
Is your industry or kind of plant missing? Tell us what to add and we will look at building a calculator for it.