Standard or regulationWhat it expects from maintenanceHow PlantOps360 helps
OISD standardsOil Industry Safety Directorate (India)
ExpectsInspection, testing and maintenance of equipment, and safe work, according to the OISD standards that apply to your facility.
PESO rulesPetroleum and Explosives Safety Organisation (India)
ExpectsLicensed installations and pressure vessels maintained and inspected as the licence conditions require.
PlantOps360Licence-related inspections scheduled, with certificates stored on the equipment.
Document management → API 510, 570 and 653In-service inspection of vessels, piping and tanks
ExpectsInspection plans, thickness readings, remaining-life calculations and repair records for pressure equipment and tanks.
PlantOps360Inspection tasks, readings and reports kept per asset, so the history is in one place. Calculations stay under your inspection authority.
Asset management → IEC 61511Safety instrumented systems
ExpectsSafety instrumented functions proof-tested at defined intervals, with records of results and repairs.
PlantOps360Proof tests as recurring tasks, with as-found results recorded and failures raised as work orders.
Calibration management → IS/IEC 60079Explosive atmospheres, equipment in hazardous areas
ExpectsEquipment in classified areas inspected and kept in a condition that preserves its protection.
Process safety managementMechanical integrity element
ExpectsWritten procedures, trained people, inspection and testing, and correction of deficiencies before further use.
PlantOps360Procedures, inspection tasks and corrective work orders linked to the equipment they cover.
Document management → This is a plain-language summary for orientation. Always follow the current text of each law and standard, and the rules of your own site and licence.