OEE Calculator for Chemical and Fertiliser Plants
For continuous chemical, ammonia, urea and petrochemical units, in tonnes and hours.
This calculator needs JavaScript. You can still read how the numbers are worked out below, including a worked example.
Your numbers
Updates as you typeYour result
Free, no sign-upGet your full OEE loss report
Your results as a PDF, with the on-stream factor and TEEP, plus our free OEE Loss Tracker (Excel) to log every period and line.
- Your result above stays free. You never need to sign up to calculate.
Your report is on its way.
Want help reading it?
Book a 30-minute OEE review with our teamWe've also emailed you the links.
How this OEE calculator works for Chemicals and Fertilisers
OEE (overall equipment effectiveness) is the share of what a continuous chemical plant could have made at its rated rate, in the time it was planned to run, that came out right first time. It multiplies availability (run time ÷ planned production time), performance (actual rate while running ÷ rated rate) and quality (on-spec output ÷ total output). Planned shutdowns are left out of planned production time. The full method, including how to choose the rated rate and how batch plants are handled, is on the OEE calculator for process industries page.
OEE = Availability × Performance × Quality
Worked example
An ammonia plant has a rated rate of 75 tonnes an hour and is measured over a full year, 8,760 hours. In the calculator above this is the starting example: a period of 8760 hours with 336 hours of planned shutdown, so planned production time is 8424 hours. Unplanned stops take 640 hours, so the plant runs for 7784 hours. It makes 520000 tonnes of ammonia, of which 515000 tonnes of ammonia are on-spec, against a rated rate of 75 tonnes of ammonia an hour.
| Factor | Calculation | Result |
|---|---|---|
| Availability | 7784 ÷ 8424 | 92.4% |
| Performance | (520000 ÷ 7784) ÷ 75 | 89.1% |
| Quality | 515000 ÷ 520000 | 99.0% |
| OEE | 92.4% × 89.1% × 99.0% | 81.5% |
Against the whole 8760 hours the plant ran 88.9% of the time (the on-stream factor) and TEEP is 78.4%. The planned shutdown is not an OEE loss, but it shows in these calendar-time figures.
The losses that matter in Chemicals and Fertilisers
Continuous chemical and fertiliser plants are built to run for long stretches between turnarounds. In the Indian ammonia plants surveyed by the Fertiliser Association of India, most forced downtime came from causes outside the plant, such as power, water and feed supply, and mechanical failures made up most of the plant-related remainder.
| Loss in Chemicals and Fertilisers | Counted in | What it looks like |
|---|---|---|
| Mechanical failures on rotating equipment | Availability | Compressors, pumps, fans and turbines stopping the plant or a section |
| Electrical and instrument trips | Availability | Power dips, relay and sensor trips that shut the plant down |
| Feed and utility interruptions | Availability | Gas, power, water or steam supply problems outside the plant’s control |
| Running below design rate | Performance | Reduced load because of fouling, catalyst decline or a downstream limit |
| Partial-load operation | Performance | Plant held at reduced rate while a fault is managed |
| Off-spec product | Quality | Product that misses specification and is downgraded or reprocessed |
Measuring OEE properly in Chemicals and Fertilisers
Plants in this sector often report on-stream days, and the on-stream factor in this calculator is the same measure (run time ÷ calendar period), so you can compare it directly. OEE adds the rate and the quality. Keep planned turnarounds out of planned production time, count reduced-rate running only as performance loss, and use the design rate or best sustained rate as the rated rate. For batch and campaign chemicals, use the rated batch yield ÷ standard batch time as the rated rate.
What do published figures say about OEE in Chemicals and Fertilisers?
The best public data for this sector is on-stream days, not OEE:
- The Fertiliser Association of India’s study of 29 ammonia and 30 urea plants for April 2017 to March 2020 found 329.4 on-stream days for ammonia and 325.5 for urea, roughly 90% and 89% of a year, lower than the previous three-year period because of more mechanical problems. (Goswami and Nand, Indian Journal of Fertilisers, March 2021.) FAI study (PDF)
- For the ammonia plants, the same study reported an average planned turnaround of 14.5 days in 2017–20 and forced downtime of 21.4 days per plant per year, about 72% of it due to factors external to the plants (power, water, feed). Of the 6.0 days a year of plant-related downtime, mechanical problems accounted for more than 87%. FAI study (PDF)
- No audited OEE benchmark for the wider chemical industry was found.
For reference, the widely quoted 85% comes from Seiichi Nakajima's 1984 book on total productive maintenance as a minimum to strive for (90% availability, 95% performance, 99% quality), and oee.com notes it was set for discrete manufacturing. Across industries, Evocon's data from more than 3,500 machines puts the typical plant nearer 55–60%. There is no audited benchmark for any single industry, so judge your line against its own trend and keep the definitions the same each time.
How maintenance software helps
- Plan preventive and condition-based maintenance on rotating equipment; in the FAI survey mechanical problems were more than 87% of plant-related downtime.
- Record every trip and forced stop with a cause code, so repeat causes in mechanical, electrical and instrument systems are found.
- Keep turnaround scopes, permits and spares in one plan, so the planned shutdown finishes on time.
More for Chemicals and Fertilisers
- Maintenance software for Chemicals and Fertilisers
- Preventive maintenance schedule for Chemicals, fertilisers & petrochemicals
- OEE software
- Downtime cost calculator
- MTTR and MTBF calculator
- OEE calculator for process industries
OEE calculators for other industries
Not your industry? Pick another one below, or search at the top of the page.
Process plants: continuous and batch How it is calculated
- CementCement, glass, ceramics & building materials
- Steel and MetalsSteel, foundry, forging & metals
- MiningMining & mineral processing
- Oil and GasOil, gas & refining
- Paper and PulpPaper, pulp & board
- Sugar and DistilleriesAgro, grain, edible oil & sugar
- DairyFood, dairy & beverage processing
- Food ProcessingFood, dairy & beverage processing
- API and Bulk DrugsAPI & bulk drugs
- TextileTextile & garments
Production lines: parts, packs and units How it is calculated
- Auto ComponentsAutomotive & auto components
- ElectronicsElectronics & electrical manufacturing
- FMCGFMCG & consumer goods
- PackagingPackaging, paper & printing
- PlasticsPlastics, rubber & polymers
- Tyre and RubberTyre & rubber
- PharmaceuticalPharmaceutical & biotech
Is your industry or kind of plant missing? Tell us what to add and we will look at building a calculator for it.