NEWPlantOps360 AI Copilot is here — auto-draft work orders & surface answers from your plant data. See what's new →
Product Industries Pricing Blog Support Center Free tools Preventive Maintenance Schedules For Enterprises Support
Preventive maintenance scheduleEquipmentRaw water / sewage pumping station

Raw water / sewage pumping station: wet well, screens and pumps Preventive Maintenance Schedule and Checklist

The raw water / sewage pumping station preventive maintenance schedule from our task library: 6 checks and jobs, from daily walk-rounds to the annual overhaul, with the time each one takes and what to look out for.

A raw water / sewage pumping station preventive maintenance schedule lists the checks and jobs done on the equipment at fixed intervals, how long each takes, and in what order of frequency, so problems are found before the raw water / sewage pumping station fails. This page gives the schedule used in the PlantOps360 task library for raw water / sewage pumping station (: wet well, screens and pumps), which follows common industry practice for general-purpose equipment. It is also searched for as pumping station, lift station, sewage pumping, wet well.

The maker’s manual and your site safety procedures always come first where they differ. Intervals set by law differ by state.

Raw water / sewage pumping station preventive maintenance schedule and checklist

How oftenTaskEstimated time
DailyCheck pump operation, wet well levels, alarms and odour; check the screen10 min
WeeklyClean the inlet screen and float switches; check pump amps and vibration20 min
MonthlyCheck pump seals, discharge valves and non-return valves; check the control panel45 min
QuarterlyCheck level sensors and telemetry; check impeller clearance (non-clog pumps)90 min
Half-yearlyPull and inspect a submersible pump: seal oil, cable and bearings150 min
AnnualAnnual service: clean the wet well, inspect pipework and valves, electrical tests300 min

Raw water / sewage pumping station maintenance frequency and yearly workload

At the estimated times, one raw water / sewage pumping station needs about 103 hours of preventive maintenance a year. The biggest single job is “Annual service: clean the wet well, inspect pipework and valves, electrical tests” at 300 minutes, done annual. Multiply by the number of units you have to see the workload for your plant.

FrequencyTasksTime per roundHours per year
Daily110 min60.8 h
Weekly120 min17.3 h
Monthly145 min9.0 h
Quarterly190 min6.0 h
Half-yearly1150 min5.0 h
Annual1300 min5.0 h

What goes wrong on a raw water / sewage pumping station without preventive maintenance

  • Screen blockage and float switch faults
  • Pump seal wear
  • Non-return valve faults
  • Control and alarm faults

What to watch between services

  • Pump operation and wet well level
  • Screen condition
  • Alarm function

Safety and statutory notes for raw water / sewage pumping station maintenance

Wet wells are confined spaces with harmful gases. Gas-test and use a permit before entry.

Where a raw water / sewage pumping station preventive maintenance schedule is used

This equipment is used in the industries below. Each link opens the preventive maintenance schedule guide for that industry, and the maintenance software page where we have one.

Browse the full list of equipment preventive maintenance schedules (317 types).

Run this raw water / sewage pumping station schedule in maintenance software

In preventive maintenance software, each row above becomes a recurring task on the asset with its checklist, time estimate and parts. Tasks can be triggered by calendar date, running hours, meter readings or production cycles, each completed task is recorded with the person and date, and a failed check can open a work order. For the method behind it, read the guide to the preventive maintenance schedule, or use the free generator to get a 12-month plan for your whole equipment list.

Build my preventive maintenance schedule (free Excel)

Frequently asked questions

How often should a raw water / sewage pumping station be serviced?

In our schedule a raw water / sewage pumping station has 6 tasks: 1 daily, 1 weekly, 1 monthly, 1 quarterly, 1 half-yearly, 1 annual. The biggest job is “Annual service: clean the wet well, inspect pipework and valves, electrical tests”, which is done annual. Always follow the maker’s manual where it gives a different interval.

What is included in raw water / sewage pumping station preventive maintenance?

It covers routine checks and jobs such as “Check pump operation, wet well levels, alarms and odour; check the screen”, “Clean the inlet screen and float switches; check pump amps and vibration”, “Check pump seals, discharge valves and non-return valves; check the control panel”, up to the annual overhaul or inspection. The full list with times is in the table above.

How many hours of maintenance does a raw water / sewage pumping station need per year?

About 103 hours per unit per year at the estimated times in our library, including the daily checks done every day. Use it to plan workload, not as a benchmark.

Is there a free raw water / sewage pumping station maintenance checklist?

Yes. The table on this page is a ready checklist. The free preventive maintenance schedule generator turns it into a 12-month Excel schedule for your list of equipment, with monthly workload hours.

Ready to run this schedule in software?

See how PlantOps360 turns these tasks into work orders and records.

PlantOps360

See PlantOps360 on your plant data

Book a 30-minute guided walkthrough tailored to your maintenance operations.

Personalized to your assets & workflows
See AI work orders & BI live
No commitment — bring your questions
Your details stay private. No spam, ever.