Demineralisation (DM) plant / ion exchange Preventive Maintenance Schedule and Checklist

The demineralisation plant preventive maintenance schedule from our task library: 6 checks and jobs, from daily walk-rounds to the annual overhaul, with the time each one takes and what to look out for.

A demineralisation plant preventive maintenance schedule lists the checks and jobs done on the equipment at fixed intervals, how long each takes, and in what order of frequency, so problems are found before the demineralisation plant fails. This page gives the schedule used in the PlantOps360 task library for demineralisation plant (plant / ion exchange), which follows common industry practice for general-purpose equipment. It is also searched for as DM plant, ion exchange, mixed bed, cation anion.

The maker’s manual and your site safety procedures always come first where they differ. Intervals set by law differ by state.

Demineralisation plant preventive maintenance schedule and checklist

How oftenTaskEstimated time
DailyRecord conductivity, silica and service flow; log regeneration cycles10 min
WeeklyCheck regeneration chemical tank levels (acid and alkali) and dosing equipment15 min
MonthlyCheck valves, strainers and pumps; check resin bed levels and for resin carry-over30 min
QuarterlyCheck conductivity meters and sampling lines; inspect distribution nozzles through the inspection port60 min
Half-yearlyCheck resin condition: capacity test or resin sample analysis120 min
AnnualInspect internals and rubber lining; top up or replace resin as needed; service valves and instruments480 min

Demineralisation plant maintenance frequency and yearly workload

At the estimated times, one demineralisation plant needs about 96 hours of preventive maintenance a year. The biggest single job is “Inspect internals and rubber lining; top up or replace resin as needed; service valves and instruments” at 480 minutes, done annual. Multiply by the number of units you have to see the workload for your plant.

FrequencyTasksTime per roundHours per year
Daily110 min60.8 h
Weekly115 min13.0 h
Monthly130 min6.0 h
Quarterly160 min4.0 h
Half-yearly1120 min4.0 h
Annual1480 min8.0 h

What goes wrong on a demineralisation plant without preventive maintenance

  • Resin exhaustion or fouling
  • Regeneration chemical dosing faults
  • Valve and strainer failures
  • Conductivity and silica breakthrough

What to watch between services

  • Outlet conductivity and silica
  • Service flow and run length
  • Acid and alkali tank levels

Safety and statutory notes for demineralisation plant maintenance

Acid and alkali are corrosive. Use the right PPE, and keep the eyewash and safety shower working and tested.

Where a demineralisation plant preventive maintenance schedule is used

This equipment is used in the industries below. Each link opens the preventive maintenance schedule guide for that industry, and the maintenance software page where we have one.

Browse the full list of equipment preventive maintenance schedules (317 types).

Run this demineralisation plant schedule in maintenance software

In preventive maintenance software, each row above becomes a recurring task on the asset with its checklist, time estimate and parts. Tasks can be triggered by calendar date, running hours, meter readings or production cycles, each completed task is recorded with the person and date, and a failed check can open a work order. For the method behind it, read the guide to the preventive maintenance schedule, or use the free generator to get a 12-month plan for your whole equipment list.

Build my preventive maintenance schedule (free Excel)

Frequently asked questions

How often should a demineralisation plant be serviced?

In our schedule a demineralisation plant has 6 tasks: 1 daily, 1 weekly, 1 monthly, 1 quarterly, 1 half-yearly, 1 annual. The biggest job is “Inspect internals and rubber lining; top up or replace resin as needed; service valves and instruments”, which is done annual. Always follow the maker’s manual where it gives a different interval.

What is included in demineralisation plant preventive maintenance?

It covers routine checks and jobs such as “Record conductivity, silica and service flow; log regeneration cycles”, “Check regeneration chemical tank levels (acid and alkali) and dosing equipment”, “Check valves, strainers and pumps; check resin bed levels and for resin carry-over”, up to the annual overhaul or inspection. The full list with times is in the table above.

How many hours of maintenance does a demineralisation plant need per year?

About 96 hours per unit per year at the estimated times in our library, including the daily checks done every day. Use it to plan workload, not as a benchmark.

Is there a free demineralisation plant maintenance checklist?

Yes. The table on this page is a ready checklist. The free preventive maintenance schedule generator turns it into a 12-month Excel schedule for your list of equipment, with monthly workload hours.

Ready to run this schedule in software?

See how PlantOps360 turns these tasks into work orders and records.

PlantOps360

See PlantOps360 on your plant data

Book a 30-minute guided walkthrough tailored to your maintenance operations.

Personalized to your assets & workflows
See AI work orders & BI live
No commitment — bring your questions
Your details stay private. No spam, ever.