NEWPlantOps360 AI Copilot is here — auto-draft work orders & surface answers from your plant data. See what's new →
Product Industries Pricing Blog Support Center Free tools Preventive Maintenance Schedules For Enterprises Support
Preventive maintenance scheduleEquipmentPaper machine: press, dryer

Paper machine: press, dryer and reel section; stock preparation Preventive Maintenance Schedule and Checklist

The paper machine: press, dryer preventive maintenance schedule from our task library: 7 checks and jobs, from daily walk-rounds to the annual overhaul, with the time each one takes and what to look out for.

A paper machine: press, dryer preventive maintenance schedule lists the checks and jobs done on the equipment at fixed intervals, how long each takes, and in what order of frequency, so problems are found before the paper machine: press, dryer fails. This page gives the schedule used in the PlantOps360 task library for paper machine: press, dryer (and reel section; stock preparation), which follows common industry practice for general-purpose equipment. It is also searched for as paper machine, dryer section, Yankee dryer, stock preparation.

The maker’s manual and your site safety procedures always come first where they differ. Intervals set by law differ by state.

Paper machine: press, dryer preventive maintenance schedule and checklist

How oftenTaskEstimated time
DailyCheck the dryer drum steam pressure and condensate, felt and wire tension, and lube oil10 min
DailyCheck the vacuum system and pumps; check the stock flow and consistency5 min
WeeklyCheck the felts and guide rolls; clean the showers and nozzles20 min
MonthlyLubricate the bearings of the rolls as per the chart; check the doctor blades and holders45 min
QuarterlyCheck the dryer cylinder, steam joints and siphons; check the drive gears and couplings90 min
Half-yearlyCheck the roll alignment and crowning, nip profile; check the refiner plates150 min
AnnualAnnual shutdown: overhaul of the drives and dryers; inspect the pressure parts600 min

Paper machine: press, dryer maintenance frequency and yearly workload

At the estimated times, one paper machine: press, dryer needs about 139 hours of preventive maintenance a year. The biggest single job is “Annual shutdown: overhaul of the drives and dryers; inspect the pressure parts” at 600 minutes, done annual. Multiply by the number of units you have to see the workload for your plant.

FrequencyTasksTime per roundHours per year
Daily215 min91.3 h
Weekly120 min17.3 h
Monthly145 min9.0 h
Quarterly190 min6.0 h
Half-yearly1150 min5.0 h
Annual1600 min10.0 h

What goes wrong on a paper machine: press, dryer without preventive maintenance

  • Felt and wire problems
  • Dryer steam and condensate faults
  • Vacuum system faults
  • Drive and roll bearing wear

What to watch between services

  • Dryer steam pressure and condensate
  • Vacuum levels
  • Roll bearing vibration

Safety and statutory notes for paper machine: press, dryer maintenance

In-running nips are a major hazard. Test the nip guards and emergency stops, and lock out before cleaning.

Where a paper machine: press, dryer preventive maintenance schedule is used

This equipment is used in the industries below. Each link opens the preventive maintenance schedule guide for that industry, and the maintenance software page where we have one.

Browse the full list of equipment preventive maintenance schedules (317 types).

Run this paper machine: press, dryer schedule in maintenance software

In preventive maintenance software, each row above becomes a recurring task on the asset with its checklist, time estimate and parts. Tasks can be triggered by calendar date, running hours, meter readings or production cycles, each completed task is recorded with the person and date, and a failed check can open a work order. For the method behind it, read the guide to the preventive maintenance schedule, or use the free generator to get a 12-month plan for your whole equipment list.

Build my preventive maintenance schedule (free Excel)

Frequently asked questions

How often should a paper machine: press, dryer be serviced?

In our schedule a paper machine: press, dryer has 7 tasks: 2 daily, 1 weekly, 1 monthly, 1 quarterly, 1 half-yearly, 1 annual. The biggest job is “Annual shutdown: overhaul of the drives and dryers; inspect the pressure parts”, which is done annual. Always follow the maker’s manual where it gives a different interval.

What is included in paper machine: press, dryer preventive maintenance?

It covers routine checks and jobs such as “Check the dryer drum steam pressure and condensate, felt and wire tension, and lube oil”, “Check the vacuum system and pumps; check the stock flow and consistency”, “Check the felts and guide rolls; clean the showers and nozzles”, up to the annual overhaul or inspection. The full list with times is in the table above.

How many hours of maintenance does a paper machine: press, dryer need per year?

About 139 hours per unit per year at the estimated times in our library, including the daily checks done every day. Use it to plan workload, not as a benchmark.

Is there a free paper machine: press, dryer maintenance checklist?

Yes. The table on this page is a ready checklist. The free preventive maintenance schedule generator turns it into a 12-month Excel schedule for your list of equipment, with monthly workload hours.

Ready to run this schedule in software?

See how PlantOps360 turns these tasks into work orders and records.

PlantOps360

See PlantOps360 on your plant data

Book a 30-minute guided walkthrough tailored to your maintenance operations.

Personalized to your assets & workflows
See AI work orders & BI live
No commitment — bring your questions
Your details stay private. No spam, ever.